Youbian has always insisted on and guaranteed to never cut corners on every 2.5mva Power and Distribution Transformer, Each device undergoes strict comprehensive acceptance testing. We provide all services from consultation, quotation, manufacturing, installation, debugging, training to after-sales service. Our products have been put into use in more than 50 countries and regions around the world.
To produce a competitive 2.5mva power and distribution transformer, Youbian has obtained 20 patents for designing a more energy-efficient, material efficient, and space saving distribution transformer. Youbian has accumulated rich experience in manufacturing high-capacity 35 kV power and distribution transformers. The company has experienced power and distribution transformer production workers who can operate automation equipment. We directly provide services for hydropower stations, mining areas, sewage treatment plants, etc. We sincerely invite you to visit our factory for guidance.
How to transport
We dismantled the panel radiator, oil storage tank, and other accessories and packed them into a plywood box, with the transformer body exposed. They are loaded into a 20 foot container.
Installation of Transformer
The 2.5mva power and distribution transformer is the second most expensive device in the power system. Therefore, extra caution must be taken when installing new power transformers in substations. When entering the interior of a power transformer, workers should empty all loose items from their pockets to prevent any items from falling into the transformer.
The tools used in work should be firmly tied with cotton ropes so that they can be found in case of accidental falling into the transformer. Huangma should not be used as a cleaning material for transformers. Even after the cleaning work is completed, loose fibers may still remain in the jute, which may affect the insulation performance of the equipment in the future. When cleaning, a clean cotton cloth should be used to ensure that there are no loose fibers on the cloth. Usually, many components of power transformers are transported separately from the manufacturer.
Installation requirements
The foundation of the 2.5mva power and distribution transformer should be 0.2 meters above the ground. In flood prone areas, drainage ditches should be set up around transformers. A brick and stone fence should be built around the transformer, with a minimum height of 1.8 meters. The outer shell door of the 2.5 mVA power distribution transformer should be made of refractory material, located on the low voltage side, open outward, and equipped with a lock. Do not use bamboo or wooden fences.
The minimum height of power distribution transformers installed on platforms or bases should be 2.5 meters.
When installing outdoors, if two or more 2.5 mVA power distribution transformers are installed, the minimum distance between their enclosures should not be less than 1.25 meters.
The casing of the 2.5mva power and distribution transformer should be kept in good condition.
The distance between the transformer and flammable buildings should not be less than 5 meters, and the distance between the transformer and fire-resistant buildings should not be less than 3 meters.
Install warning signs on the walls or bases of the cabinet, with the words "Caution: High Voltage - No Entry" written in English.
Hot Tags: 2.5mva Power and Distribution Transformer, Manufacturer, Supplier, Wholesale
If you have any enquiry about quotation or cooperation, please feel free to email us at river@dahuelec.com or use the following inquiry form. Our sales representative will contact you within 24 hours. Thank you for your interest in our products.